Our quality control division ensures our customers that any
product being shipped from TSM is double checked with the
proper inspection methods. Using our master quality manual,
the correct processing steps are followed; including incorporating
our CMM for more precise measurements. With our current
system, we can trace all materials being shipped in and out.
This traceability extends to the inspection reports as well as
measurements obtained from that specific job lot. All jobs are
assigned a reference number along with a process sheet.
The process sheet follows the job onto the floor to reduce the chance of any problems that may
arise. All of our shipped parts will have some level of inspection record pertaining to them. Each
part is inspected after each operation and requires written approval before proceeding to the next
operation. Per customer request, we can submit any applicable documents linked with the job,
including material certification. This current system has greatly reduced our non-conforming parts.
Welder operators have multiple certifications including D1.1 structural.
All of our inspection equipment is calibrated and traceable to N.I.S.T
Contact Us
Tallmadge Spinning & Metal Co.
2783 Gilchrist Rd.
Akron, Ohio 44305
Phone: 330 . 794 . 2277
Fax: 330 . 794 . 2270
email us
Contact TSM Today!
Call us to quote your next
project.
©2010 Tallmadge Spinning & Metal | All Rights Reserved
Designed by EmTech
877-876-4423